SR 212 Beach Boulevard Landscape

SR 212 Beach Boulevard Landscape

Opening a gateway to the Florida coast.

Serving as a key connection between Jacksonville, FL and the coastal area of Jacksonville Beach, Florida, SR 212/Beach Boulevard carries residents and tourists to their coastal destinations. District 2 of the Florida DOT selected current members of the PRIME AE team to design the roadway landscape on a 2.2-mile stretch of the road with a goal of creating a welcoming gateway to the coast for beachgoers.

With this goal in mind, our team coordinated with an adjacent project to ensure an aesthetically unified landscape design along the roadway. Because landscape areas along the road corridor were limited, we performed a critical analysis to maximize landscape opportunities in even the most constrained spaces. Complete project development services included design development and final landscape and irrigation design plans, including several cost opinions. PRIME AE also provided post-design services, performing site visits at critical project milestones to keep the project moving.

Located in the heart of hurricane country, this project was under construction when both Hurricane Irma and Hurricane Matthew impacted the Jacksonville area. We met this major challenge head-on, utilizing a unique large palm staking detail which withstood the high winds and rain without any failures, and prevented palms from falling in the roadway. As a result, we were able to successfully support completion of the project even in hazardous weather conditions, providing travelers a safe and striking gateway to the beach.

Client / Owner

Florida Department of Transportation (FDOT)

Key Features

Key Feature
2.2 Mile Project
$1,600,000 Construction Cost
Project Specific Palm Staking Details
Construction Period Complete, Project in 2-Year Establishment Period
Unique Large Palm Staking Design

Project Achievements

The major achievements of the SR 212 Beach Boulevard Landscape project involved close collaboration with other area projects to ensure an unbroken landscape design, and the huge challenge of continuing active work during Hurricane Irma and Hurricane Matthew. PRIME AE’s innovative approach and persistent dedication ensured the success of the project.

  • Coordinated unified landscape design
  • Unique palm staking to ensure road safety in high winds and rains
  • Gateway Project to Beaches

We’re Excited For The Future We Can Build Together

For more than a decade, we’ve been delivering solutions for the places we live, learn, laugh, and grow. Give us a call to learn how we can help you.