Multi-Stage Overhead Bridge Replacement
Roadway and Bridge, NE Extension
PRIME AE is providing construction management services to deliver this $8 million project that includes a two-span spread concrete box-beam structure in multi-staged construction.
Work on this project includes concrete footer/abutment/pier placements, widening of the Pennsylvania Turnpike with sound wall/caissons, several phases of traffic control and maintenance and protection of traffic, beam setting, concrete deck placement, bituminous roadway reconstruction and drainage, right-of-way fence, guide rail, and construction of sedimentation basins.
Project Details
Pennsylvania Turnpike Commission
Montgomery and Bucks County, PA